城市轨道交通工程改造项目,应贯彻执行最新的规范标准,在施工过程中不能影响线路系统的运行,需充分做好其他相关系统的改造及接口调试工作,以保证本系统与其他系统的协调。除完成本系统内设备的安装和调试外,还应以满足轨道交通运营和乘客服务的需求为前提。论文以上海轨道交通5号线全线FAS系统大修改造项目为依托,对城市轨道交通火灾报警系统改造工程的难点进行探讨。
The transformation project of urban rail transit engineering should implement the latest specifications and standards.It can not affect the operation of the line systems in the construction process,and needs to fully do well the reconstruction and interface debugging work of other related systems to ensure the coordination between the system and other systems.In addition to completing the installation and debugging of the equipment in the system,it should also take meeting the needs of rail transit operation and passenger service as the premise.Based on the overhaul and reconstruction project of whole line FAS system of Shanghai Rail Transit Line 5,this paper discusses the difficulties in the reconstruction engineering of urban rail transit fire alarm system.
作者
赵鑫
ZHAO Xin(Shanghai Installation Engineering Group Co.,Ltd.,Shanghai 200080,China)
出处
《中小企业管理与科技》
2021年第13期174-175,共2页
Management & Technology of SME
关键词
火灾报警系统
改造
城市轨道交通
fire alarm system
reconstruction
urban rail transit