高墩大跨连续刚构桥合龙段顶推施工技术与施工监控

Jacking Construction Technology and Construction Monitoring of Closure Section of High-pier and Long-span Continuous Rigid Frame Bridge
下载PDF
导出
摘要 本文结合延延高速公路黄河特大桥,介绍了顶推施工工艺以及施工监控。通过合龙时施加适当的顶推力,减小由砼收缩徐变、温差等引起的附加内力,补偿了收缩徐变和高温合龙产生的顺桥向位移,确保了刚构桥后期运营阶段的安全。 Based on the Yellow River Bridge of Yan'an-Yanchuan Expressway,this paper introduces the jacking construction technology and construction monitoring.By applying appropriate jacking force during closure,the additional internal force caused by shrinkage and creep of concrete and temperature difference is reduced,and the displacement along the bridge caused by shrinkage and creep and high temperature closure is compensated,so as to ensure the safety of the rigid frame bridge at the later stage of operation.
作者 李艳梅 LI Yan-mei(The No.3 Engineering Co.,Ltd.of China Railway 14th Bureau Group Corporation,Ji'nan 250300,China)
出处 《价值工程》 2021年第10期132-135,共4页 Value Engineering
关键词 连续刚构桥 合龙段 顶推施工 施工监控 continuous rigid frame bridge closing section jacking construction construction monitoring
  • 相关文献

参考文献4

二级参考文献31

共引文献98

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部