期刊文献+

风电塔筒浮吊翻身作业

Wind Turbine Tower Floating Crane Turnover Operation
下载PDF
导出
摘要 风电的塔筒业务是整个产业链重中之重,在风电行业内,塔筒已从陆上逐步转向海上风电,乃至远海发展,塔筒的直径也从原先的2 m到8 m,12 m,制作的难度和吨位越来越大。针对海上风电塔筒作业,通过浮吊翻身装船,加大陆上的吊装工作来减轻海上作业量。 The tower business of wind power is the top priority of the entire industry chain.In the wind power industry,the tower is a pioneer in processing and manufacturing,gradually shifting from onshore to offshore wind power,and even offshore development.The diameter of the tower has also changed from the original From 2 m to 8 m,12 m,it can be said that the difficulty and tonnage of production are getting bigger and bigger.This article is aimed at offshore wind turbine tower operations.The floating crane is turned over to load the ship,and the hoisting work on the road is increased to reduce the amount of offshore operations.
作者 刘立峰 Liu Li-feng
出处 《电力系统装备》 2021年第7期75-76,共2页 Electric Power System Equipment
关键词 风电 塔筒 起重作业 wind power tower lifting operation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部