通过某4×150 MW火力发电厂性能测试点温度套管脱落原因的分析,对火电厂高温高压蒸汽管道取源部件的设计、施工进行了探讨,为投运后相应问题的处理提供了借鉴。
The temperature bushings have fallen off after passing the performance test point of a 4×150 MW thermal power plant.The analysis of the cause,the design and construction of the source components of the high-temperature and high-pressure steam pipelines in thermal power plants were discussed,which provided a reference for the handling of corresponding problems after commissioning.
作者
许延庆
郭尹龙
Xu Yan-qing;Guo Yin-long
出处
《电力系统装备》
2021年第7期90-91,共2页
Electric Power System Equipment
关键词
电厂
温度底座
焊接
power plant
temperature base
welding