期刊文献+

水电站建设区表土资源评价与利用探析 被引量:1

Evaluation and Utilization of Surface Soil in Hydropower Station Construction Area
下载PDF
导出
摘要 为了理清水电站建设区的表土资源量,通过实地调查取样分析项目区表土资源数量,测定表层土壤的理化性质,结合相关规范标准,对项目区表土数量、质量及其养分含量进行评价。结果表明:项目区的表土资源主要集中在耕地,林草地表土分布总体较薄且多为含砾石土层,项目区表土总量满足迹地恢复的覆土量,表土质量基本符合青藏高原区土地复垦林草地质量控制标准。 In order to find out the topsoil resources in the construction area of hydropower stations,the amount,quality and nutrient content of the surface soil in the project area are evaluated by field investigation and sampling to analyze the amount of surface soil resources in the project area,determine the physical and chemical properties of the surface soil in accordance with relevant norms and standards.The results show that the topsoil resources in the project area are mainly concentrated in arable land,the distribution of forest and grassland topsoil is generally thin and most are gravel-bearing soil layers,the amount of topsoil meets the amount of cover soil for site restoration,and the topsoil quality is basically in line with the forest and grassland quality control standards for land reclamation in the Qinghai-Tibet Plateau.
作者 李红星 李婧 岳增璧 马红丽 Li Hongxing;Li Jing;Yue Zengbi;Ma Hongli(PowerChina Northwest Engineering Corporation Limited, Xi'an 710065,China;Ordos Water Conservancy Survey and Design Institute,Ordos,Inner Mongolia 017200,China)
出处 《西北水电》 2021年第2期34-37,47,共5页 Northwest Hydropower
关键词 表土资源 表土质量 青藏高原区 topsoil resources topsoil quality Qinghai-Tibet Plateau
  • 相关文献

参考文献6

二级参考文献30

共引文献41

同被引文献20

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部