引大济湟工程隧道三维超前地质预报 被引量:3

Tunnel 3D Advanced Geological Prediction in Yinda-Jihuang Project
下载PDF
导出
摘要 引大济湟工程引水隧洞线路长、埋深大、地下水位高,且沿途穿越多条大断层,主要工程地质问题突出。为了减少和有效预防地质灾害发生,准确预判掌子面前方地质条件和可能出现的地质灾害,现场开展了TGS360 Pro隧道三维超前地质预报与分析,成功预报了可能发生涌水、突泥和坍塌等地质灾害的隧洞桩号洞段,并采取了应急处理措施,为施工开挖方案和支护措施提供了有效依据。 The diversion tunnel of the Yinda-Jihuang project has an unfavorable engineering condition such as long tunnel route,deep buried depth,high groundwater level,and passes through many large faults along the tunnel route.In order to reduce and effectively prevent the occurrence of geological disasters and predict the geological condition and potential geological disasters at the working surface,the project has carried out the 3D advanced geological prediction and analysis with TGS360 Pro,which successfully predicted the tunnel chainage section where may occur water burst,mud gushing and collapse may occur,and emergency measures have been taken.The geological prediction provides a basis for the construction excavation plan and the support measures.
作者 李海宁 段君奇 LI Haining;DUAN Junqi(Qinghai Yinda-Jihuang Project Construction and Operation Bureau, Xining 810000,China;PowerChina Northwest Engineering Corporation Limited, Xi'an 710065,China)
出处 《西北水电》 2021年第2期43-47,共5页 Northwest Hydropower
基金 青海省科技厅科技成果转化专项项目(2020-SF-138).
关键词 引大济湟 TGS360 Pro 隧道超前地质预报 Yinda-Jihuang project TGS360 Pro tunnel advanced geological prediction
  • 相关文献

参考文献15

二级参考文献113

共引文献423

同被引文献69

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部