摘要
结合刚果(金)布桑加水电站开发利用河段的地形地质条件、交通施工条件、工程投资及运行调度等因素,通过经济技术比选,最终选择了下坝址、下坝线、碾压混凝土拱坝、坝身泄洪系统、左岸引水系统及地面厂房的枢纽布置方案,并进行了优化设计,保证了工程安全、经济、合理。
Based on the conditions and factors of geology,layout conditions,construction and transportation,investment and operation schedule,the scheme including the layout of dam site,dam line,RCC arch dam,flood-discharge system,and left-bank ground powerhouse is selected through comprehensive economic and technological comparisons.The design of the recommended layout scheme is optimized to ensure the safe,economic and optimal operation of the hydropower station in conditions and each building with its distinct characteristics.
作者
孙宝成
王坤
张珺
崔进
王晶晶
SUN Baocheng;WANG Kun;ZHANG Jun;CUI Jin;WANG Jingjing(PowerChina Guiyang Engineering Corporation Limited, Guiyang 550081,China;Guizhou Water Conservancy Investment Group Co., Ltd., Guiyang 550001,China)
出处
《西北水电》
2021年第2期59-63,共5页
Northwest Hydropower
关键词
布桑加水电站
枢纽布置
水工建筑物
优化设计
Busanga Hydropower Station
project layout
hydraulic structure
design optimazation