摘要 在冬季风吹雪严重时期,常有电气设备被积雪掩埋,对变电站的安全运行造成了比较严重的影响。通过对风吹雪地区变电站电气设备选型与配电装置布置方案进行分析,采用户外AIS断路器方案及电气设备布置优化可避免电气设备被积雪掩埋,并有利于机械车辆清扫积雪。 During the severe wind-blown snow in winter,electrical equipment is often buried by snow,which has a serious impact on the safe operation of substations.By analyzing the type selection of electrical equipment and the layout of power distribution devices in substations in wind-blown snow areas,the use of outdoor AIS circuit-breakers and the optimization of electrical equipment layout can prevent electrical equipment from being buried by snow,and help mechanical vehicles to clear snow.
作者 谈东林 Tan Donglin(CPECC Southwest Electric Power Design Institute Co.,Ltd.,Chengdu 610021,Sichuan,China)
出处 《四川电力技术》 2021年第2期58-61,82,共5页 Sichuan Electric Power Technology
关键词 变电站 风吹雪 电气设备选型 布置方案 substation wind-blown snow type selection of electrical equipment layout plan
  • 相关文献

参考文献2

二级参考文献6

共引文献8

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部