摘要 针对新建输电线路工程中存在的铁塔利旧问题,分析了新建工程的气象条件和导地线型号与原有铁塔的设计使用条件不一定完全相符的工程设计条件。通过按新设计条件验算、校核,得出对原有塔型不能铁塔利旧,以防止出现以小带大的情况,给工程安全带来隐患。 Aiming at the problem of reusing the original tower in the new transmission line construction,this paper analyzes the engineering design conditions that the meteorological conditions of the new project and the model of the ground wire are not necessarily consistent with the design and use conditions of the original tower.Through checking and checking according to the new design conditions,it is concluded that the old tower can not be used for the original tower type,so as to prevent the situation that the small one leads to the large one and bring hidden danger to the engineering safety.
作者 王永华 查传明 陈国庆 孙家文 华东 李文强 WANG Yonghua;ZHA Chuanming;CHEN Guoqing;SUN Jiawen;HUA Dong;LI Wenqiang(State Grid Xinjiang Electric Power Company Economic and Technological Research Institute,Urumchi 830000,China;China Energy Engineering Group Xinjiang Electric Power Design Institute Co.,Ltd,Urumchi 830000,China;State Grid Jilin Electric Power Co.,Ltd.Economic Technological Research Institute,Changchun 130062,China)
出处 《吉林电力》 2021年第2期50-53,共4页 Jilin Electric Power
关键词 输电线路 铁塔 利旧 张力差 应力比 transmission line tower use of the original tension deviation stress ratio
  • 相关文献

参考文献2

二级参考文献19

共引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部