拟建高层建筑物对已有隧道安全评估分析

SAFETY ASSESSMENT OF EXISTING TUNNELS BY PROPOSED HIGH-RISE BUILDINGS
下载PDF
导出
摘要 以青岛地铁8号线土岩组合地层正上方拟建建筑物为研究背景,采用数值模拟对基底附加应力对已有隧道结构及地层的影响进行了安全评估。由分析可知,基底附加应力对下部隧道结构产生的应力以及变形满足规范要求,处于安全状态。土层的变形要明显大于岩层的变形,且距基底较近的土层还出现变形放大区间。故实际施工时,应把建筑物层高适当降低,或进行地基加固处理用以控制土层变形。 Taking the proposed building directly above the soil-rock combination stratum of Qingdao Metro Line 8 as the research background,the impact of additional stress on the existing tunnel structure and stratum was evaluated by numerical simulation.It can be seen from the analysis that the stress and deformation caused by the additional stress of the basement to the lower tunnel structure met the requirements of the code and were in a safe state.The deformation of the soil layer was obviously larger than that of the rock layer,and the deformation amplification interval appeared in the soil layer close to the basement.Therefore,the actual construction should be appropriate to reduce the height of the building,or for foundation reinforcement treatment to control soil deformation.
作者 李广胜 张瑾 吕秋臻 王梦雪 奚传浩 LI Guangsheng;ZHANG Jin;LV Qiuzhen;WANG Mengxue;XI Chuanhao(School of Civil Engineering,Qingdao University of Technology,Shandong Qingdao 266033,China)
出处 《低温建筑技术》 2021年第4期120-123,共4页 Low Temperature Architecture Technology
基金 国家自然科学基金青年基金项目(41702320) 山东省高等学校科技计划项目(J17KA204)。
关键词 土岩组合 数值模拟 基底附加应力 隧道结构 soil-rock assemblage numerical simulation additional stress of basement tunnel structure
  • 相关文献

参考文献9

二级参考文献63

共引文献75

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部