摘要 为了探究中隔墙在基坑开挖条件下对隧道结构位移的控制情况,将中隔墙分别设置在不同位置工况下,研究结果表明设置在距离隧道一定水平距离的悬臂式中隔墙可以有效地控制基坑围护和隧道结构的水平位移及隧道竖直方向的净空收敛,但是埋入式中隔墙对基坑和隧道的位移控制效果更好,且埋入式中隔墙的墙顶应设置在隧道水平位移影响区内,越靠近水平位移影响区的下边界时控制效果越好。 In order to explore the control of the middle partition wall on the tunnel structure displacement under the condition of foundation pit excavation,the middle partition wall is set at different positions.The results show that the cantilever middle partition wall set at a certain horizontal distance from the tunnel can effectively control the horizontal displacement of foundation pit support and tunnel structure,meanwhile,it can control the clearance convergence in the vertical direction of the tunnel.However,the embedded middle partition wall is better under the same conditions,and the top of the embedded middle wall should be set in the horizontal displacement influence area of the tunnel.The closer to the lower boundary of the horizontal displacement influence area,the better the control effect is.
作者 涂锐 刘浜葭 TU Rui;LIU Bangjia(Department of Architecture and Civil Engineering,Datong Vocational and Technical College of Coal,Shanxi Datong 037001,China;School of Civil Engineering,Liaoning Technical University,Liaoning Fuxin 123000,China)
出处 《低温建筑技术》 2021年第4期128-133,共6页 Low Temperature Architecture Technology
关键词 基坑开挖 隧道 位移控制 中隔墙 foundation pit excavation tunnel displacement control the middle partition wall
  • 相关文献

参考文献16

二级参考文献162

共引文献962

同被引文献31

引证文献6

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部