期刊文献+

现有地铁出入口上方新建结构施工技术

Construction Technology of Newly-built Structure above Subway Entrance in Operation
下载PDF
导出
摘要 将地铁车站的出入口与周围商业建筑修建成一个整体,可以改善地铁乘客的通行并节约土地,但商业建筑与其内部的地铁出入口的施工往往不是同时进行,会互相影响使用,本文结合上海市的一处紧邻地铁的工程,对地铁出入口上方新建结构的施工提出了新的思路,为类似工程的施工提供了参考。 The entrances of the subway station are always integrated into the surrounding commercial buildings,which can improve the passage of subway passengers and save the space.However,the construction of commercial buildings and its internal subway entrances are often not carried out at the same time,which will affect the use of each other.This paper puts forward a new idea for the construction of the new structure above the subway entrance basing on a project adjacent to the subway in Shanghai,and provides a reference for the construction of similar projects.
作者 李俊 LI Jun(Shanghai Construction No.7 Group Co.,Ltd.,Shanghai 200050,China)
出处 《价值工程》 2021年第11期104-105,共2页 Value Engineering
关键词 地铁车站 商业建筑 地铁出入口 上部结构 钢平台 subway station commercial building subway entrance newly-built structure steel platform
  • 相关文献

参考文献5

二级参考文献6

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部