摘要
阐述了前言金山区枫泾镇二官塘等骨干河道整治一期工程水泥土换填地基面临的各种实际困难,通过正式施工前对影响合格率的因素分析,过程中严格管控,最终实现提高护岸水泥土换填地基合格率的目标。
The practical difficulties faced by the cement-soil replacement foundation of the first phase of the main river regulation project such as Erguantang in Fengjing Town,Jinshan District are expounded.Through the analysis of the factors affecting the qualified rate before the formal construction and the strict control in the process,the goal of improving the qualified rate of the revetment cement-soil replacement foundation is finally realized.
作者
朱建吉
ZHU Jian-ji(Shanghai Huajin Construction Co.,Ltd.,Shanghai 200063,China)
出处
《价值工程》
2021年第11期110-113,共4页
Value Engineering
关键词
水泥土
换填地基
合格率
cement-soil
replacement foundation
qualified rate