期刊文献+

一种面向订单剩余完工时间预测的SOM-FWFCM特征选择算法 被引量:4

A SOM-FWFCM Based Feature Selection Algorithm for Order Remaining Completion Time Prediction
下载PDF
导出
摘要 准确的订单剩余完工时间预测有助于动态调整生产计划、优化制造过程,以满足订单产品按时交付的需求。订单剩余完工时间受到车间物料、设备、在制品等各类生产要素的综合影响,相关数据具有典型的大量、多维、高冗余的特点,有效的特征选择能够获得更高的预测精度。在构建候选特征集的基础上,提出了一种基于自组织映射(SOM)网络特征加权模糊C均值(FWFCM)的特征选择算法。通过构建SOM网络初始化FWFCM的聚类中心,减少后者对初始聚类中心的依赖;基于互信息计算特征权重,实现导向性特征聚类,根据聚类结果选择特征代表,构成高质量关键特征子集。以某机加工车间的生产数据为例,通过与其他4种特征选择算法的对比分析,验证了所提算法的有效性。 Accurate ORCT prediction was helpful to adjust production schedule and optimize manufacturing processes dynamically,which ensured timely orders delivery.ORCT affected by various production factors,including materials,equipment,works-in-process,et al.The related data possessed typical characteristics of large-scale,multi-dimensions and high-redundancy.Effective feature selection might improve the prediction accuracy.On the basis of constructing candidate feature sets,a feature selection algorithm was proposed based on SOM-FWFCM algorithm.Firstly,the cluster centers of FWFCM algorithm were initialized by SOM network to reduce the reliance on initial cluster centers.Feature weights were calculated by mutual information to achieve feature clustering with guidance.Then,according to the cluster results,representational features were selected to build high-quality key feature subset.Finally,taking the production data of a machining shop as an example,the effectiveness of the proposed algorithm was verified by comparing with other four feature selection algorithms.
作者 刘道元 郭宇 黄少华 方伟光 杨能俊 崔世婷 LIU Daoyuan;GUO Yu;HUANG Shaohua;FANG Weiguang;YANG Nengjun;CUI Shiting(College of Mechanical and Electrical Engineering,Nanjing University of Aeronautics and Astronautics,Nanjing,210016)
出处 《中国机械工程》 EI CAS CSCD 北大核心 2021年第9期1073-1079,共7页 China Mechanical Engineering
基金 国家自然科学基金(51575274) 国防基础科研项目(JCKY2016605B006,JCKY2017203C105)。
关键词 大数据 订单剩余完工时间 特征选择 自组织映射 特征加权模糊C均值 big data order remaining completion time(ORCT) feature selection self-organizing map(SOM) feature weighted fuzzy C-means(FWFCM)
  • 相关文献

参考文献7

二级参考文献44

  • 1杜巧连,张克华.基于自身振动信号的液压泵状态监测及故障诊断[J].农业工程学报,2007,23(4):120-123. 被引量:33
  • 2Moses S, Grant H, Gruenwald L, et al. Real- time Due date Promising by Build--to order Environments[J].International Journal of Production Research, 2004,42(20) :4353-4375.
  • 3Duenyas I, Hopp W J. Quoting Customer Lead Times[J]. Management Science, 1995,41 (1) :43- 57.
  • 4Spearman M L, Zhang R Q. Optimal Lead Time Policies[J].Management Science,1999,45(2) :290- 295.
  • 5Weng Z K. Strategies for Integrating Lead Time and Customer- order Decisions[J].IIE Transactions,1999,31(2) :161-171.
  • 6Hopp W J, Sturgis M R. A Simple, Robust Leadtime--quoting Policy[J].Manufacturing & Service Operations Management, 2001,3 ( 9 ) : 321-336.
  • 7Gordon V, Proth J, Chu C. A Survey of the State --of--the--art of Common Due Date Assignment and Scheduling Research[J]. European Journal of Operational Research, 2002,139 ( 1 ) : 1-25.
  • 8De P, Ghosh J B, Wells C E. Optimal Due--date Assignment and Sequencing[J]. European Journal of Operational Research, 1992,57(3) :323-331.
  • 9Roman D B, Valle A G. Dynamic Assignation of Due--dates in an Assembly Shop Based in Simulation[J]. International Journal of Production Research,1996,34(6):1539-1554.
  • 10Grant H, Goldsman D, Moses S. Using Simulation to Evaluate Buffer Adjustment Methods in Order Promising [C]//Proeeedings of the 2002 Winter Simulation Conference. San Diego, CA, 2002 : 1838 -1845.

共引文献65

同被引文献26

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部