期刊文献+

东宝河停车场总图布置优化研究

Study on the optimization of the general layout of Dongbaohe parking lot
下载PDF
导出
摘要 分析停车场总平面方案一存在的不足之处,对总平面布置进行优化,推出总平面方案二。总平面方案二镟轮、洗车作业走行距离短,工艺流程顺畅。站场线路长度缩短,道岔数量减少。减少车辆磨耗,降低运营成本。解决了镟轮作业影响消防通道、干扰运用库车辆维护作业的重要问题。 This paper analyzes the shortcomings of the parking lot general layout plan 1,optimizes the general layout,and puts forward the general layout plan 2.General layout plan 2 meets the requirements of short running distance of wheel turning and car washing operation and smooth process flow.The length of station line is shortened and the number of turnouts is reduced.It reduce vehicle wear and reduce operating costs.It solves the important problems that the wheel turning operation affects the fire passage and interferes with the vehicle maintenance operation in the application depot.
作者 王长春 Wang Changchun(Shenzhen Municipal Design&Research Institute Co.,Ltd.,Shenzhen 518000,China)
出处 《山西建筑》 2021年第11期16-18,共3页 Shanxi Architecture
关键词 停车场 总图布置 镟轮线 优化 parking lot general layout wheelset-lathing line optimization
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部