空客A220飞机舱门精益生产线规划研究 被引量:1

Lean Production Line Planning for Airbus A220 Aircraft Door
下载PDF
导出
摘要 为了提高空客A220飞机舱门生产线装配效率,降低人力工时成本,首先采用精益思想,利用时间测量法测量了舱门生产现场的装配工时数据,确定产能提高所需的工装数量;其次利用意大利面条图统计了现场操作者在装配操作过程中的物流动向,分析可能存在的浪费现象。基于浪费现象和舱门装配工艺流程特点,选择产品聚簇式的原则布置舱门生产线,同时按照工业工程方法确定整体站位串行、局部瓶颈站位并行的布局形式,建立了舱门精益生产线。最后通过3ds Max软件对整体布局进行三维渲染。 In order to improve the assembly efficiency of Airbus A220 aircraft door production line and reduce the labor and man-hours,firstly,the assembly time data of door production line was measured by time measurement method based on lean thinking in this paper,and the number of tooling needed to improve the production capacity is determined;Secondly,the Spaghetti diagram was used to analyze the logistics trend of operators in the assembly process,and the possible waste phenomenon is analyzed.Based on the waste phenomenon and the characteristics of door assembly process flow,the door production line is arranged according to the principle of product clustering.At the same time,the layout form of the whole station serial and the local bottleneck station parallel are determined referring to the IE(industrial engineering)method,then the door lean production line is established.Finally,3D rendering was conducted for the overall layout by 3ds Max software.
作者 刘敏 王大维 杨艳瑞 杨五兵 LIU Min;WANG Dawei;YANG Yanrui;YANG Wubing(AVIC SAC Commercial Aircraft Company LTD.,Shenyang 110000,China)
出处 《航空制造技术》 CSCD 北大核心 2021年第8期50-57,共8页 Aeronautical Manufacturing Technology
关键词 A220舱门 精益思想 工业工程 生产线 3ds Max A220 door Lean concepts Industrial engineering(IE) Production line 3ds Max
  • 相关文献

参考文献5

二级参考文献27

共引文献40

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部