摘要
软土含水量高、强度低、渗透性低的特点加大了深基坑降水的难度,增加了地铁建设中的风险。本文依托绍兴市轨道交通2号线越王路站工程项目,基于越王路站基坑的规模和工程特点,对深厚软土地区深基坑降水设计方案和深基坑降水施工关键技术进行研究,获取了降水设计方案和关键施工技术流程,可为类似工程施工提供借鉴。
Soft soil has the typical properties of high water content, low strength and low permeability, which increases the dif f iculty in the dewatering of deep foundation pit a nd the risk in subway construction. Taking the Yuewang Road Station of Shaoxing Rail Transit Line 2 for example, based on the scale and geological characteristics of the foundation pit of Yuewang Road station, the design scheme of deep foundation pit dewatering in deep soft soil area and the key construction technology of deep foundation pit dewatering construction are investigated. Finally, the design scheme and technical process are obtained.
作者
杨琛
苟学登
苏轩彬
田野
王纪云
李超
YANG Chen;GOU Xuedeng;SU Xuanbin;TIAN Ye;WANG Jiyun;LI Chao(Sinohydro Engineering Bureau 4 Co.,Ltd.,Xining 810007;Hangzhou Zhekeda Science and Technology Co.,Ltd.,Hangzhou 310016)
出处
《中国建材科技》
CAS
2021年第2期102-104,23,共4页
China Building Materials Science & Technology
关键词
深厚软土
深基坑
降水
突涌
封井
deep soft soil
deep foundation pit
dewatering precipitation
inrushing
sealing well