摘要
华北某铁选厂采用三段-闭路破碎-阶段磨矿-阶段磁选-磁重选精选工艺流程。为通过技术进步提升矿山综合效益,对高压辊磨—预选工艺应用可行性进行了探讨,结果表明:实施高压辊磨-预选工艺改造是可行的,同时可显著降低选厂加工成本。
An iron beneficiation plant in North China adopts a selected process flow that three stages and one closed circuit crushing-stage grinding-stage magnetic separation-magnetic and gravity separation.In order to improve the comprehensive benefits of mine by technological progress,this paper discusses the feasibility of the application of high-pressure roller mill-preconcentration process.The results shows that it is feasible to implement the improvement of high pressure roller grinding-preconcentration process,and it can significantly reduce the processing cost of beneficiation plant.
作者
王建中
郭鹏
WANG Jianzhong;GUO Peng(Taiyuan Iron and steel(Group)Co.,Ltd.,mining branch Jianshan Iron Mine,Taiyuan 030300,China)
出处
《矿业工程》
CAS
2021年第2期38-42,共5页
Mining Engineering
关键词
高压辊磨
湿式预选
开路试验
闭路筛分
邦德功指数
high pressure roller mill
wet preconcentration
open circuit test
closed circuit screening
bond work index