摘要
山西省万家寨引黄工程北干线,是解决山西省朔州市和大同市工业及城市生活用水的大型引水工程。文中通过对1号隧洞的地质勘探、结构计算、合理设计衬砌和防渗,使该项目达到预期的效果。
The north trunk line of Wanjiazhai Yellow River Diversion Project in Shanxi Province is a large-scale water diversion project for industrial and urban consumption in Shuozhou City and Datong City.Through geological exploration,structural calculation,reasonable design of lining and anti-seepage of No.1 tunnel,the expected effect of this project is achieved.
出处
《东北水利水电》
2021年第5期5-6,11,71,共4页
Water Resources & Hydropower of Northeast China
关键词
引水隧洞
衬砌
防渗
设计分析
water diversion tunnel
lining
anti-seepage
design analysis