期刊文献+

城轨车辆段上盖开发项目售价盈亏平衡分析 被引量:1

Analysis of profit and loss balance of real estate sale price in the development project of the upper cover of urban rail vehicle depot
下载PDF
导出
摘要 城市轨道交通主要穿越主城区,与之配套的车辆段(停车场)用地规模大,对其进行上盖开发,有利于节约集约用地。但开发项目以盈利为目的,预测售价需在盈亏平衡点以上项目才可行。因此,分析车辆段上盖开发基本形式和基本建设时序,总结出该类项目的基本操作流程和现金流量图,据此分析售价盈亏平衡临界点的计算模型,为判断项目是否可行提供参考。 Urban rail transit mainly crosses the main urban area,and its vehicle depot(parking lot)is large in land use scale.It is beneficial to save intensive land by covering and developing it.However,for the purpose of profit,the project with the predicted property sale price above the balanced amount is feasible.Therefore,this paper analyzes the basic layout and time sequence of the development of the upper covered depot,and summarizes the basic operation work flow and cash flow chart of the project.Based on this,it analyzed the calculation model of the critical point in the balance sheets of the sale price,providing a reference for identifying the feasibility of projects.
作者 赵峰 Zhao Feng
出处 《现代城市轨道交通》 2021年第5期115-119,共5页 Modern Urban Transit
关键词 城市轨道交通 车辆段 盈亏平衡 上盖开发 建设时序 urban rail transit depot balance of profit and loss top cover development construction sequence
  • 相关文献

参考文献5

二级参考文献28

共引文献11

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部