结合工程实际,对复杂环境条件下施工塔吊的拆除方案进行了研究。通过汽车吊站位、汽车吊型号、堆放场.地、是否降低标准节等方面对施工方案进行比选,确定了最终的方案,并顺利完成了塔吊的拆除,总结的经验可为类似项目提供参考。
Combined with the engineering practice, the construction tower crane demolition scheme under complex environmental conditions is studied. The construction schemes were compared and selected from the aspects of truck crane position, truck crane model, stacking site, whether to reduce the standard section, etc., the final scheme was determined, and the tower crane demolition was successfully completed. The experience can provide reference for similar projects.
作者
李飞
LI Fei(Sunyoung Construction(Group)Co.,Ltd.,Shanghai 200335,China)
出处
《建筑施工》
2021年第4期614-616,共3页
Building Construction
关键词
复杂环境条件
塔吊拆卸
方案比选
BIM
complex environmental conditions
tower crane demolition
scheme comparison
BIM