摘要
测量塔在深坞区沉管二次舾装期间安装,为提高沉管安装定位精度,选择将沉管坐落在深坞底进行标定。文中论述一种沉管坐底式标定方法,通过在沉管顶部指定位置和测量塔顶安装定位装置,确定定位装置在沉管坐标系中的位置;进而同时采集管顶与测量塔顶定位装置的定位信息。该定位信息得出测量塔定位装置在沉管坐标系中的坐标。
The measuring tower is installed during the secondary outfitting of the immersed tube in the deep dock area,in order to improve the positioning accuracy of the immersed tube,the immersed tube is selected to be located at the bottom of the deep dock for calibration.In this paper,a method of bottom sitting calibration of immersed tube was described.The position of the locating device in the coordinate system of the immersed tube was determined by setting the positioning device on the top of the immersed tube and installing the locating device on the top of the measuring tower.Then,the positioning information of the positioning device on the top of the tube and the measuring tower was collected simultaneously.The positioning information is used to obtain the coordinates of the positioning device of the measuring tower in the coordinate system of the immersed tube.
作者
刘兆权
成益品
锁旭宏
孙海丰
宁进进
LIU Zhao-quan;CHENG Yi-pin;SUO Xu-hong;SUN Hai-feng;NING Jin-jin(CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China;No.2 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Qingdao,Shandong 266071,China)
出处
《中国港湾建设》
2021年第5期42-45,87,共5页
China Harbour Engineering
基金
广东省重点领域研发计划项目(2019B111105002)。
关键词
沉管
测量塔
坐底标定
immersed tube
measuring tower
bottom sitting calibration