深中通道西人工岛现浇隧道设计使用寿命达100 a,其中钢筋工程作为关系到工程内在质量的关键点,是工程质量管理的重点。文章以深中通道西人工岛现浇隧道钢筋工程精细化管理为例,对钢筋工程各施工环节质量通病或质量控制进行总结,对钢筋工程质量控制及通病治理提出了一系列举措,取得了较为突出的效果,可为类似工程提供借鉴。
The design service life of the cast-in-situ tunnel in the west artificial island of Shenzhen-Zhongshan Link is up to 100 years,among which the reinforcement engineering is the key point related to the internal quality of the project,and it is the key point of the project quality management.Taking the refined management of the reinforcement engineering of cast-in-situ tunnel in the west artificial island of Shenzhen-Zhongshan Link as an example,the common quality defects or quality control of each construction link of the reinforcement engineering were summarized,and a series of measures were put forward for the quality control and common fault treatment of the reinforcement engineering,which has achieved prominent results,and can provide reference for similar projects.
作者
刘昊槟
王朔
王从李
郑伟涛
LIU Hao-bing;WANG Shuo;WANG Cong-li;ZHENG Wei-tao(CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China;No.1 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300456,China)
出处
《中国港湾建设》
2021年第5期78-82,共5页
China Harbour Engineering
关键词
深中通道
现浇隧道
钢筋工程
精细化管理
Shenzhen-Zhongshan Link
cast-in-situ tunnel
reinforcement engineering
refined management