期刊文献+

海上油田污水处理不达标的问题探究及解决方案 被引量:9

Study on the substandard problem and solutions of sewage treatment in offshore oilfield
下载PDF
导出
摘要 根据海上某高产中心生产单元生产污水处理中呈现的问题,再结合该中心生产单元注水水质不达标的原因分析结果,确定了三级清污装置清污能力达不到要求、流程设计存在缺陷、流程管理不配伍等因素是导致中心生产单元生产污水处理不合格的主要因素。从清污装置内部优化和流程管理升级等方面提出解决方案并展开研究,为全面解决海上中心生产单元生产污水处理问题进行探索实践,并提出今后同类项目的探索和研究的方向。 According to the problems of sewage treatment in the production unit of a high-yield center on the sea,combined with the analysis of substandard water quality of the injection water in production unit,the main factors lead to the unqualified sewage treatment in the central production unit were that the cleaning capacity of the three-stage cleaning device was not up to the requirements,the process design was defective,and the process management was not compatible.The solutions had been proposed,from the cleaning device internal optimization and process management upgrading,in order to solve the problem of sewage treatment in offshore production unit.The direction of exploration and research of similar projects in the future was put forward.
作者 张绍广 汪本武 黄焌淞 史毓泉 代齐加 陈宴辉 Zhang Shaoguang;Wang Benwu;Huang Junsong;Shi Yuquan;Dai Qijia;Chen Yanhui(CNOOC(China)Limited Tianjin Branch,Tianjin 300450,China)
出处 《工业水处理》 CAS CSCD 北大核心 2021年第5期131-134,139,共5页 Industrial Water Treatment
关键词 中心生产单元污水 系统优化 回注水质 sewage in central production unit system optimization reinjection water quality
  • 相关文献

参考文献5

二级参考文献23

共引文献92

同被引文献82

引证文献9

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部