摘要
以疫情下周浦医院北院的应急改造方案为例,围绕其建筑布局的改造、负压病房的改造以及其他改造策略等进行分析探讨,详细阐述了平疫转换的负压病房楼设计。
Taking the emergency reconstruction plan of Zhoupu hospital as an example,this paper analyzes and discusses the reconstruction of its building layout,the reconstruction of negative pressure ward and other renovation strategies,and shows how the case can be transformed into a negative pressure ward building for the conversion of the normal time and epidemic time.
出处
《中国医院建筑与装备》
2021年第5期34-35,共2页
Chinese Hospital Architecture & Equipment
关键词
平疫转换
三区两通道
负压病房
Transformation from peacetime to wartime
Three area and two passages
Negative pressure ward