摘要
浙江某公司全新建成2套220万t/aPTA装置及配套公用工程设施。全项目达产后其综合能耗相较2015年以前的PTA工厂有了比较大的提升,在激烈的市场竞争中具备了较好的比较优势。
A company in Zhejiang has newly built two sets of 2.2 million tons/year PTA devices and supporting utility facilities.After the completion of the whole project,its comprehensive energy consumption has been greatly improved compared with that of PTA plants before 2015,and it has a relatively good comparative advantage in the fierce market competition.
作者
郑永伟
肖海峰
左东
屠建平
张保强
杨新强
ZHENG Yong-wei;XIAO Hai-feng;ZUO Dong;TU Jian-ping;ZHANG Bao-qiang;YANG Xin-qiang(Xinfengming Group Co.,Ltd.Tongxiang 314513,China;Zhejiang Dushan Energy Co.,Ltd.,Pinghu 314200,China)
出处
《聚酯工业》
CAS
2021年第3期30-31,共2页
Polyester Industry
关键词
PTA
综合能耗
蒸汽
精馏
PTA
comprehensive energy consumption
steam
distillation