期刊文献+

工作面快速掘进工艺及设备优化研究 被引量:1

Study on the Technology and Equipment Optimization of Working Face Rapid Tunneling
下载PDF
导出
摘要 为保证掘进效率与采煤效率相匹配、保证煤炭的产出率,在分析当前掘进工艺和掘进设备现状的基础上,分别对自动化、可靠性、生产效率较低的掘进设备进行优化,并对掘进设备相配套的掘进工艺(打眼、支护、运输等)进行优化,从根本上提升掘进工作面的效率和安全性。 In order to ensure the matching of tunneling efficiency and coal mining efficiency to ensure the coal output rate,on the basis of analyzing the current tunneling technology and the current situation of tunneling equipment,the tunneling equipment with low automation,reliability and production efficiency is optimized respectively,and the tunneling technology(drilling,supporting,transportation,etc.)matching tunneling equipment is optimized to fundamentally improve the efficiency and safety of tunneling face.
作者 李军军 Li Junjun(Daxi Coal Mine of Jinneng Holdings Group,Yangcheng Shanxi 048105)
出处 《机械管理开发》 2021年第4期136-137,共2页 Mechanical Management and Development
关键词 掘进工艺 掘进设备 循环进尺 装载机 液压钻车 tunneling technology tunneling equipment circular ruler loader hydraulic drilling vehicle
  • 相关文献

参考文献5

二级参考文献38

共引文献131

同被引文献18

引证文献1

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部