摘要
针对2022年卡塔尔世界杯主场馆卢赛尔体育场全生命周期BIM应用需求以及施工图(IFC)设计阶段的建模要求,对BIM模型命名的关键因素进行分析和排序。根据海外项目的BIM应用模式,以英文缩写和数字结合的方式,构建包含9个字段共21个字符的模型命名体系。结合世界杯体育场的项目特点,建立依次以阶段、专业、楼层和区域为依据的模型划分标准,并在卢赛尔体育场中进行检验和完善。研究表明,对模型进行科学的命名和划分,将直接决定项目的模型质量和BIM应用效果。
According to the requirements of the lifecycle BIM application of the Lusail Stadium,the main stadium of Qatar World Cup in 2022,and the modeling requirements of the issue for construction(IFC)design stage,the key factors for naming the models of the World Cup stadium are analyzed and ranked.Based on the BIM application method of the overseas projects,with the combination of English abbreviations and numbers,a model naming system consisting of 9 parts and 21 characters in total is established.Combined with the characteristics of the stadium,the author established a model division standard by stages,disciplines,levels and zones,then tested and perfected it in Lusail Stadium.Studies show that scientific naming and division of models will directly determine the model quality and BIM application effect.
作者
张健
ZHANG Jian(China Railway Construction International Co.,Ltd.,Beijing 100039,China)
出处
《施工技术》
CAS
2021年第8期48-51,共4页
Construction Technology
基金
中国铁建股份有限公司科技研发计划项目(2020-B22)。
关键词
体育场
钢结构
建筑信息模型
命名体系
划分标准
stadiums
steel structures
building information modeling(BIM)
model naming system
model division standard