摘要
封井压采是控制地下水超采的重要措施。江苏省射阳县依据省压采方案,严格按照相关规程规范,有理有节、依法依规着实推进封井压采工作。实施全局一盘棋,明确责任抓落实,按照"一井一策"分类施策等措施,有效保障了封井压采工作的按时保质完成,取得了显著成效。
Well closure and reduction of water withdrawal are key measures to control groundwater overexploitation.Sheyang County in Jiangsu Province has shut-in wells to reduce water withdrawal in accordance with relevant standards and regulations and provincial plans.Other measures are adopted such as giving overall consideration to reach water balance,specifying responsibilities and implementing“one well,one policy”strategy,which ensure completion of work on time and in high quality and achieve good result.
作者
闻雪之
张子来
寇雅芳
Wen Xuezhi;Zhang Zilai;Kou Yafang
出处
《中国水利》
2021年第9期46-47,共2页
China Water Resources
关键词
地下水
封井压采
地下水资源
射阳县
groundwater
well closure and reduction of water withdrawal
groundwater resources