摘要
针对乐山典型地质情况,依托钢板组合剪力墙百米高层工程项目,总结施工及检测中遇到的问题,从基础施工方案比选着手,在施工难度、质量控制、工程进度及成本控制等方面总结经验并给予建议,为乐山地区或类似地质条件下百米高层建筑基础施工积累经验数据。
According to the typical geological conditions of Leshan,relying on the steel plate composite shear wall 100m high-rise project,this paper summarizes the problems encountered in the construction and testing,starting from the comparison and selection of the foundation construction scheme,summarizes the experience and gives suggestions in the aspects of construction difficulty,quality control,project progress and cost control,so as to accumulate valuable experience for the foundation construction of 100m high-rise buildings in Leshan area or similar geological conditions experience data.
作者
程振宇
周礼婷
肖艳宏
Cheng Zhen-yu;Zhou Li-ting;Xiao Yan-hong
出处
《建筑技术开发》
2021年第7期147-148,共2页
Building Technology Development
关键词
高层建筑
基础施工
方案比选
high-rise buildings
foundation construction
comparion and selection of scheme