卵石地层中盾构下穿盾构隧道的设备改造及施工控制 被引量:1

Equipment transformation and construction control of undercrossing shields in existing tunnels of gravel stratum
下载PDF
导出
摘要 依托北京地铁16号线双线盾构下穿既有地铁4号线盾构隧道工程,探讨了卵石地层中地铁盾构施工穿越既有盾构隧道工况下的盾构设计改造,结合既有隧道沉降监测数据分析了盾构施工参数的调控经验。研究表明:针对地层特点进行的盾构关键结构设计改造,可提升盾构掘进、耐磨、脱困和防水性能;既有隧道变形受双线盾构先后穿越施工的二次影响显著,通过顶推力、土仓压力等盾构施工参数的及时调整,配合有效的注浆和补浆措施,可减小穿越施工对既有隧道的影响。 The precedent project based on dualshield tunnels of Subway Line 16 undercrossing shield tunnels of Subway Line 4 in Beijing was studied.The equipment transformation of the shield was analyzed,meanwhile,the experience of shield construction parameters adjustment was combined with the in-situ monitoring data of settlement of existing shield tunnels.Research shows that the shield key equipment transformation with the stratum characteristics can improve performances of shield tunneling and wear-resistance,out of stuck and waterproofing.The settlement of existing tunnels is obviously affected by the secondary disturbance of successive traversing construction.The influence of undercrossing construction on existing tunnels can be reduced by adjustment measures of the shield construction parameters control,such as thrust force and the working chamber pressure in time.The effective grouting and the supplementary grouting measures are cooperated.
作者 马文辉 杨成永 彭华 程霖 刘君伟 王永刚 MA Wen-hui;YANG Cheng-yong;PENG Hua;CHENG Lin;LIU Jun-wei;WANG Yong-gang(School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China;Beijing MTR Co.Ltd,Beijing 100068,China;Beijing Branch of China Railway Firstgroup Co.,Ltd,Beijing 100176,China)
出处 《桂林理工大学学报》 CAS 北大核心 2021年第1期105-110,共6页 Journal of Guilin University of Technology
基金 国家自然科学基金项目(51478032,51578053)。
关键词 土压平衡盾构 卵石地层 穿越施工 设备改造 施工控制 earth pressure balanced shield gravel stratum undercrossing construction equipment transformation construction control