摘要
国家会议中心二期主体结构南北长达456m,施工中保证大跨度轴线的测量精度十分重要,为此通过将大跨度轴线分段,应用后方交会的方法进轴线投测,保证了轴线的测设精度。
The main structure of China National Conference Center Phase Ⅱ is as long as 456 m from south to north,so it is very important to guarantee the large-span axial measurement accuracy.Therefore,the large-span axial line was divided and backward intersection method was adopted for the axial line measurement,to guarantee the measurement accuracy of the axial line.
作者
孟宪磊
董静飞
周建忠
李海鹏
MENG Xian-ei;DONG Jing-fei;ZHOU Jian-zhong;LI Hai-peng(Shjjazhuang Tiedao University,050043,Shiiazhuang,China;Beijing No.3 Construction Engineering Co.,Ltd,100044,Beijing,China)
出处
《建筑技术》
2021年第5期625-626,共2页
Architecture Technology
关键词
大跨度
结构施工测量
后方交会
large-span
structure construction measurement
backward intersection