摘要
国家会议中心二期工程施工中,针对场地条件复杂,水平运输条件有限,施工组织难度大等施工难点,通过设置钢栈桥、运输通道和起重机拆除通道,应用履带式起重机路基箱等方式解决了复杂场地内的水平运输问题,为施工组织创造了条件。
During the construction of China National Conference Center Phase Ⅱ,in view of the complex site conditions,limited horizontal transportation conditions,and difficult construction organization,the complex was solved by setting up steel trestle bridges,transportation channels and crane dismantling channels,and applying crawler crane subgrade boxes.The horizontal transportation problem within the site created conditions for construction organization.
作者
常诚
霍斌峰
付小敏
吴迪
高文冬
CHANG Cheng;HUO Bin-feng;FU Xiao-mian;WU Di;GAO Wen-dong(.Bejjing Mechanized Construction Group Co.,Ltd,100045,Bejjing.China;Beijing Beichen Exhibition Investment Co..Ltd,100101,Beijing,China)
出处
《建筑技术》
2021年第5期627-629,共3页
Architecture Technology
关键词
水平运输
钢栈桥
运输通道
路基箱
horizontal transportation
steel trestle bridge
transportation channel
subgrade box