期刊文献+

综采工作面快速回撤安装技术经验分析

Experience Analysis of Rapid Retreat Installation in Fully Mechanized Mining Face
下载PDF
导出
摘要 为做好综采工作面的快速回撤安装工作,介绍了综采工作面回撤前应做的主要准备工作,分析了回撤工艺流程及安装工艺流程,探讨了人员车辆的组织方法,总结了现场组织及协调策略,以期通过充分的准备、精细的安装以及科学的组织协调,能进一步提高综采工作面回撤安装效率,更好地保障采煤工作的顺利接替。 In order to do a good job in the quick withdrawal and installation of fully mechanized mining face, this paper introduces the main preparatory work to be done before the withdrawal of fully mechanized mining face, analyzes the withdrawal process and installation process, discusses the organization method of personnel and vehicles, and summarizes the field organization and coordination strategy.Through full preparation, fine installation and scientific organization and coordination, the efficiency of withdrawal and installation of fully mechanized mining face can be further improved, and the smooth replacement of coal mining work can be better guaranteed.
作者 杨鹏飞 Yang Pengfei(Licun Coal Mine,Lu'an Chemical Group,Changzhi Shanxi 046000)
出处 《机械管理开发》 2021年第3期278-280,共3页 Mechanical Management and Development
关键词 综采工作面 回撤 安装 准备 工艺 组织 fully mechanized mining face withdrawal installation preparation process organization
  • 相关文献

参考文献2

二级参考文献2

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部