期刊文献+

深基坑V形后倾式爆破施工技术在麻城市浮桥水厂二期工程中的应用 被引量:1

Application of construction technology of V-shaped backward inclined blasting in deep foundation pits in the second phase of Macheng Fuqiaohe Water Plant Project
下载PDF
导出
摘要 V形后倾式爆破施工技术广泛运用于各行业深基坑爆破施工。在麻城市浮桥河水厂二期工程中,通过对V形后倾式爆破施工的布孔、炮孔倾角与倾向、炮孔装药结构进行优化,解决了传统V形后倾式爆破施工岩块大、块率产出过高、不利于挖掘装运的问题。该施工技术在爆破自由面少、岩石级别不超过XV级的各行业深基坑岩石爆破开挖中具有较高的推广价值。 The construction technology of V-shaped backward inclined blasting is widely used in deep foundation pit blasting construction of various industries.The problems such as large rock block,high block rate output as well as unfavorable excavation and loading in the traditional V-shaped backward inclined blasting are solved through optimizing the hole distribution,hole angle inclination and tiling as well as hole charging structure of V-shaped backward inclined blasting construction in the second phase of Macheng Fuqiaohe Water Plant Project.The construction technology has high promotion value in deep foundation pit rock blasting excavation of various industries with less blasting free surface and more than XV grade of rock.
作者 熊志平 程旭 杨盼 XIONG Zhiping;CHENG Xu;YANG Pan(Hubei Shengdatai Water Conservancy and Hydropower Engineering Co.,Ltd.,Wuhan 430060,China)
出处 《水利建设与管理》 2021年第5期73-77,83,共6页 Water Conservancy Construction and Management
关键词 炮孔倾向倾角 大孔距小排距 耦合分段装药 V形后倾式毫秒延时起爆网络 非电毫秒导爆管雷管 数码电子雷管 hole tilting and angle inclination large hole spacing and small row spacing coupling staged charging V-shaped backward inclined millisecond delay initiation network non-electric millisecond detonator digital electronic detonator
  • 相关文献

参考文献6

二级参考文献9

共引文献33

同被引文献11

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部