期刊文献+

乌弄龙水电站500kV 高压电缆敷设与安装

Laying and Installation of 500kV High Voltage Cable inWunonglong Hydropower Station
下载PDF
导出
摘要 乌弄龙水电站地面GIS与地下联合单元GIS通过500kV高压电缆连接,GIS之间有1段75m高压电缆竖井。500kV高压电缆的使用相比SF6管母在安装形式上更为简便,造价成本较低,但安装施工难度较大,因有较长的垂直安装距离,施工安全风险大。研究高压电缆敷设、安装,电缆试验等方面遇到的问题,通过研讨相应处理方法解决了大量现场设计、施工难题,为电站高压电缆安全稳定运行提供了技术保障。 The ground GIS of Wunonglong Hydropower Station and the underground combined unit GIS are connected by 500kV high-voltage cable,and there is a 75m high-voltage cable shaft between them.Compared with SF6 tubular bus,500kV HV cable is more convenient in installation form and has lower cost,but it is difficult to install and construct.Due to long vertical installation distance,construction safety risk is high.The problems existing in laying,installation and testing of high-voltage cable are studied.A lot of difficult problems in field design and construction are solved by discussing corresponding treatment methods,which provides technical guarantee for safe and stable operation of high-voltage cable in power plant.
作者 兰宇 刘兴胜 张晗 高盼盼 LAN Yu;LIU Xing-sheng;ZHANG Han;GAO Pan-pan(HuanengLancang River Hydropower Inc.,Wunonglong-Lidi Hydropower Project Construction Administration,Weixi 674606,China)
出处 《云南水力发电》 2021年第5期102-105,共4页 Yunnan Water Power
关键词 水电站 500kV高压电缆 敷设 高压试验 hydropower station 500kv high voltage cable laying high-voltage experiment
  • 相关文献

参考文献7

二级参考文献5

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部