摘要
介绍乌弄龙水电站机电金结设计。该电站于2018年12月31日首台机组完成72h试运行并直接进入商业运行,至7月13日全部4台机组投产发电。乌弄龙水电站作为云南迪庆州境内目前装机容量最大的常规水电站,其机电金结设计主要特点是采用了先进成熟可靠的技术,满足机组在高原地区长周期安全稳定运行及自动化控制运行正常。目前该电站机组已安全稳定运行了近2a,各项技术指标符合电站“无人值班、少人值守”的技术条件。自投运以来,发电量累计达到90.8×10^(8)kW·h。
This paper describes the design of electromechanical equipment and metal structure in Wunonglong Hydropower Station.The first unit of the plant completed 72-hour commissioning on December 31,2018 and went directly into commercial operation.By July 13,all 4 units had been put into operation for power generation.As the conventional hydropower station with the largest installed capacity in Diqing City,Wunonglong Hydropower Station adopts advanced,mature and reliable technology to meet the requirements of long-term safe and stable operation of units and normal operation of automatic control in plateau area.At present,the unit has been operating safely and steadily for nearly 2 years,and each technical index meets the technical conditions of unattended mode.Since putting into operation,the cumulative power generation has reached 90.8×10^(8)kW·h.
作者
邱崇俊
占乐军
刘军
张云广
QIU Chong-jun;ZHAN Le-jun;LIU Jun;ZHANG Yun-guang(Huaneng Lancang River Hydropower Inc.,Wunonglong-Lidi Hydropower Project Construction Administration,Weixi 674606,China)
出处
《云南水力发电》
2021年第5期106-111,共6页
Yunnan Water Power
关键词
乌弄龙水电站
机电金结设计
水轮发电机组
Wunonglong Hydropower Station
design of electromechanical equipment and metal structure
turbine generator unit