乌弄龙、里底两个水电站创精品机组,超前策划、创新模式、推进精品机组建设。经过几年来的探索与实践,乌弄龙、里底两个水电站创建精品机组取得了突破,乌弄龙水电站实现了首台机精品机组;里底水电站实现了末台机精品机组。机组振动、摆度、瓦温及可靠性指标均达到了预期精品效果目标。
This paper describes the methods and achievements of promoting classic unit construction for Wunonglong and LidiHydropower Stations.After years of exploration and practice,breakthroughs have been made in the creation of quality units for Wunonglong and Lidi Hydropower Stations,Wunonglong Hydropower Station realizes the classic unitof first machine and Lidi Hydropower Station realizes the classic unit oflast machine.Vibration,swing,tile temperature and reliability indexes of the unit have reached the expected high-quality effect target.
作者
王超
占乐军
WANG Chao;ZHAN Le-jun(HuanengLancang River Hydropower Inc.,Wunonglong-Lidi Hydropower Project Construction Administration,Weixi 674606,China)
出处
《云南水力发电》
2021年第5期143-146,共4页
Yunnan Water Power
关键词
超前策划
创新模式
精品机组
advanced planning
innovation mode
classic unit