摘要 为了提高寺河煤矿工作面上隅角和回风瓦斯的治理效果,根据工作面顶板覆岩地质特征及开采条件,在煤层上覆顶板岩层内施工顶板高位大直径定向钻孔,依据经验公式确定了顶板大直径高位定向钻孔布置层位。针对顶板硬岩大直径定向钻孔施工过程中先导定向钻孔钻进及分级扩孔效率低的问题,将冲击螺杆马达、扭力冲击器与双级双速扩孔钻具分别应用于定向先导孔与扩孔施工,以提高顶板高位大直径定向钻孔整体施工效率。应用效果表明:冲击螺杆马达成孔技术与扭力冲击旋转扩孔技术提速效果显著,最高钻进速率分别为13.6m/h和11.1m/h,最终形成的?200mm大直径高位定向长钻孔保证了钻孔轨迹在煤层顶板裂隙带内有效延伸,实现了对采动卸压瓦斯的持续稳定抽采,取得了良好的瓦斯抽采和治理效果,平均单孔瓦斯抽采量达到3.36m^(3)/min,单孔瓦斯瞬时最大抽采量可达26.0m^(3)/min。 In order to improve the control effect of the upper corner and the return air gas of the coal face,large diameter directional borehole is constructed in the coal seam overlying roof strata. According to the geological characteristics and mining conditions of roof overburden in working face of Sihe Coal Mine,and based on the empirical formula,the high-level directional long borehole arrangement layer of roof is determined. Aiming at the low efficiency of pilot directional drilling and graded reaming in the large diameter directional drilling in roof hard rock,the impact screw motor,torsional impactor and two-stage and two-speed reaming drilling tools are applied respectively in pilot borehole construction and reaming construction,which can improve the overall efficiency of roof high-level large diameter directional drilling. The application results in Sihe Coal Mine show that the drilling efficiency is improved significantly using impact screw motor and graded reaming technology. The maximum drilling rates are 13. 6 m/h and 11. 1 m/h,respectively. The large diameter and high-level directional long drilling of ?200 mm can ensure the effective extension in the seam roof fracture zone,thus to continuously and stably extract the mining pressure relief gas,favorable gas extraction and control effect is obtained,the average gas extraction flow of a single hole reaches 3. 36 m^(3)/min and the instantaneous maximum gas extraction capacity of a single hole reaches 26. 0 m^(3)/min.
作者 陈沁东 赵建国 杨冬冬 CHEN Qin-dong;ZHAO Jian-guo;YANG Dong-dong(Sihe Coal Mine of Jincheng Anthracite Coal Mining Group Co.,Ltd.,Jincheng 048205,China;Xi’an Research Institute of China Coal Technology and Engineering Group Corp,Xi’an 710077,China)
出处 《煤炭工程》 北大核心 2021年第4期49-55,共7页 Coal Engineering
基金 国家科技重大专项资助项目(2016ZX05067-001-003) 中煤科工集团西安研究院有限公司技术创新基金资助项目(2018XAYZD01)。
关键词 顶板高位定向钻孔 大直径 冲击螺杆马达 扭力冲击器 双级双速 roof high-level directional drilling large diameter impact screw motor torsional impactor two-stage and two-speed