摘要 设备密封门是高温气冷堆反应堆厂房内大型设备的重要进出通道,也是阻断火情蔓延的重要建筑构配件。结合设备密封门的结构设计,分析设备密封门耐火极限的影响因素对防火的影响,研究了设备密封门最小填充材料厚度计算,并通过耐火试验测试了设备密封门的耐火极限。结果表明,高温气冷堆设备密封门双门一体的结构设计经过耐火试验验证了其设计的合理性,能够保证至少1.5 h耐火极限。 The equipment sealing hatch is an important access for large equipment in the high temperature gas-cooled reactor plant,and is also an important building component to stop the spread of fire.The influence factors of the equipment sealing hatch's fire endurance were analyzed combined with the structure of the equipment sealing hatch.The minimum thickness of filling material for equipment sealing hatch was studied.Fire test was performed to investigate the duration of fire resistance.The results indicated that two hatches integrated structure design was verified to be reasonable via the fire resistance test.The fire resistance rating of the equipment sealing hatch was greater than or equal to 1.5 h.
作者 赵彬彬 高旭 金东杰 沈斌 张然 ZHAO Bin-bin;GAO Xu;JIN Dong-jie;SHEN Bin;ZHANG Ran(Chinergy Co.,Ltd.,Beijing 100193,China)
出处 《消防科学与技术》 CAS 北大核心 2021年第4期477-480,共4页 Fire Science and Technology
基金 国家重大专项资助项目(2011ZX06907-001)。
关键词 设备密封门 耐火极限 耐火试验 equipment sealing hatch fire endurance fire resistance test
  • 相关文献

参考文献12

二级参考文献36

  • 1西屋公司的AP1000先进非能动型核电厂[J].现代电力,2006,23(5):55-65. 被引量:44
  • 2苏琳,周恒洋.浅谈压力容器焊接质量控制[J].低温与特气,2006,24(6):22-23. 被引量:9
  • 3Standard Review Plan, NUREG-0800[R]. U.S. Nuclear Regulatory Commission, 1996.
  • 4ASME Boiler and Pressure Vessel Code. Section III. Rules For Construction Of Nuclear Facility Components[R]. New York, 2001.
  • 5ASME Boiler and Pressure Vessel Code. Section II. Material[R]. New York, 2001.
  • 6RG1. 100, Seismic Qualification of Electric and Mechanical Equipment for Nuclear Power Plants, Rev. 2[R]. U.S. Nuclear Regulatory Commission, 1988.
  • 7IEEE Std 344, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations[R]. 2004.
  • 8ASME B&PVC规范,第Ⅷ卷,第2册[S].附录J,2001.
  • 9RCC-M,Design and Construction Rules for Mechanical Components of PWR Nuclear Islands, afcen, 2000 Edition [S].
  • 10ASME Boiler and Pressure Vessel Code, Section Ⅲ, Division 1, Subsection NE, Class MC Components, 2004 Edition[S].