结合工程实例,就电厂汽机基础底板施工技术要点进行了深入的分析,着重从施工测量、钢筋安装、模板施工、混凝土施工等几个方面进行论述,并提出了施工中质量控制措施。
Combining engineering examples,this article analyzes the technical key points for foundation slab construction of steam turbine in a power plant,focusing on several aspects such as construction measurement,steel reinforcement installation,formwork construction,concrete construction,etc.,and proposes quality control measures during construction.
出处
《建筑技术开发》
2021年第8期43-44,共2页
Building Technology Development
关键词
电厂
汽机基础底板
模板施工
混凝土施工
power plant
steam turbine foundation slab
formwork construction
concrete construction