结合拉萨某净水厂特点,从光伏组件选择、光伏方阵设计、并网接入系统、系统保护及安全措施、电缆敷设等方面介绍了净水厂光伏发电方案设计,并计算了发电量,节能分析结果表明光伏发电站建成后大大降低了净水厂运行成本,达到低碳、节能、减排的效果。
Combined with the characteristics of a water purification plant in Lhasa,the design of photovoltaic power generation scheme for the water plant is introduced from the aspects of photovoltaic module selection,photovoltaic array,grid-connected system,system protection and security measures,cable laying,etc.The power generation is calculated.The results of energy conservation analysis show that after the completion of the photovoltaic power station,the operating cost of the water purification plant is greatly reduced,and the effect of low carbon,energy conservation and emission reduction is achieved.
作者
龚靔立
GONG Tianli(Shanghai Municipal Engineering Design Institute(Group)Co.,Ltd.,Shanghai 200092,China)
出处
《现代建筑电气》
2021年第5期63-66,共4页
Modern Architecture Electric
关键词
净水厂
光伏发电
节能
发电量计算
water purification plant
photovoltaic power generation
energy conservation
power generation calculation