摘要 为了明确宁芜高速公路改扩建项目应急临时保通线工程从某尾矿库库尾经过对该尾矿库的安全影响,通过采用数值计算方法,定量分析该尾矿库库尾采用劲性体桩处理路基并填方筑路对尾矿库的安全性影响,得到因施工路段距离尾矿库坝体较远,无论是桩基础的挤土效应还是填方工程直接施加荷载作用均未对尾矿库坝体稳定性产生影响。 In order to clarify the safety impact of the emergency temporary Baotong line project of the reconstruction and expansion project of Ning Wu Expressway from the tail of a tailings pond,the numerical calculation method is adopted to quantitatively analyze the safety impact of the tailings pond tail using rigid body pile to treat the subgrade and fill the road on the tailings pond Neither the compaction effect of the foundation nor the direct loading effect of the filling project has an impact on the stability of the tailings dam.
作者 曾霄祥 黄广黎 刘涛 曹其光 尹清海 ZENG Xiao-xiang;HUANG Guang-li;LIU Tao;CAO Qi-guang;YIN Qing-hai(MAANSHAN Mining Research Institute Co.,Ltd,Ma'anshan 243000,China;Huawei metal mineral resources efficient recycling National Engineering Research Center Co.,Ltd,Ma'anshan 243000,China)
出处 《世界有色金属》 2021年第7期167-169,共3页 World Nonferrous Metals
基金 “十三五”国家重点研发计划项目(2017YFC0804603) 安徽省自然科学基金项目(1808085ME135) 金属矿山安全与健康国家重点实验室开放课题(2018-JSKSSYS-02)。
关键词 数值计算 劲性体桩 挤土效应 施加荷载 尾矿库坝体稳定性 numerical calculation rigid body pile soil compaction effect applied load tailings dam stability