地铁出入段线处大功率负荷配电问题研究

The Study of Long-distance Distribution for High Power Load in Metro
下载PDF
导出
摘要 出入段线、出入场线大功率负荷配电是城市轨道交通低压配电设计中常见的问题。本文针对两种配电方案进行优缺点分析,以实际案例为基础,综合考虑各配电方案的计算结果和造价成本。因此,在方案选定过程中需对多种方案进行分析计算,以本实际案例的计算过程作为参考,进一步根据每个方案的工程造价进行比较选择,确定最为经济、可靠的方案进行实施。 The high power load power distribution for entry and exit lines,which is the common problem in low voltage distribution of urban rail transit.This paper analysis the advantages and disadvantages of two solutions.Based on the actual case,the calculation results and the costs were considered.Therefore,it was important to calculate multiple solutions during the comparison of the options.Refer the calculation for this case,and the cost of each solution,the most economical and the most reliable will be choosed to apply.
作者 程迪 CHENG Di(China Railway SIYUAN Survey and Design Group Co.,Ltd,Wuhan 430063)
出处 《铁道勘测与设计》 2021年第2期93-95,共3页 Railway Survey and Design
关键词 低压配电 负荷计算 经济性 出入段线 Low Voltage Distribution Load Calculation Economy Entry and Exit Lines
  • 相关文献

参考文献2

二级参考文献1

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部