期刊文献+

加强水利工程造价全过程控制与管理的措施

Measures to Strengthen the Whole Process Control and Management of Water Conservancy Project Cost
下载PDF
导出
摘要 在当前时期,水利工程的受重视程度提高了很多,然而其造价控制的难度是较高的,尤其是产生影响的因素较多,若想改变此种情况,必须要将全过程造价管理予以有效落实,这样方可保证造价控制真正赋有实效。针对水利工程造价展开全过程管理时,要将工程建设的各个环节纳入其中,并要针对造价控制展开全面分析,寻找到切实可行的措施,保证每个环节的管控能够切实做到位,如此方可使得资金利用率大幅提高,造价超预算能够切实避免。 In the current period,the importance of water conservancy projects has increased a lot,but the difficulty of cost control is high,especially the factors that affect it.If we want to change this situation,we must effectively implement the whole process cost management,so as to ensure the real effectiveness of cost control.When carrying out the whole process management of water conservancy project cost,it is necessary to include all aspects of the project construction and carry out a comprehensive analysis of the cost control,find practical measures to ensure that the control of each link can be done in place,so as to greatly improve the utilization rate of funds and avoid the cost exceeding the budget.
作者 董亚楠 DONG Yanan(Shandong Jinqiao Construction Project Management Co.,Ltd.,Weifang,Shandong,262700,China)
出处 《工程建设(维泽科技)》 2021年第6期1-3,共3页 Engineering Construction
关键词 水利工程 造价全过程 控制与管理 相应对策 water conservancy project whole process of construction cost control and management corresponding countermeasures
  • 相关文献

参考文献5

二级参考文献9

共引文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部