摘要
船舶加热盘管在船舶庞大的管路系统中占有一定的比重,但是船舶的管路三维布置设计还是通过手工一根根布置操作完成,其效率较低。为此,本文开展船舶加热盘管自动布置技术探索和研究。通过采用“S”型的路径规划方案布置管路和路径回溯算法来判断路径规划终止条件,完成空间内探路,以出口管路算法形成完整路径。最后应用加热盘管的总长度优化算法,达到设计长度要求。通过在三维平台开发和模型验证结果表明,船舶加热盘管自动布置系统可以缩短设计时间80%以上,取得良好效果。
The ship heating pipe occupies a certain proportion in the huge piping system of the ship, but the three-dimensional piping layout design of the ship is completed by manual one-by-one arrangement operation, which is inefficient.Therefore, this paper carries out exploration and research on automatic routing technology of ship heating pipe.Firstly, by using the "S" type route planning plan to arrange pipelines and path traceback algorithm to judge the termination conditions of path planning, the space exploration is completed.The complete path is formed by the outlet pipeline algorithm again.Finally, the total length of heating pipe is optimized to meet the design length requirements.The results of three-dimensional platform development and model test show that the automatic routing system of ship heating pipe can shorten the design time by more than 80% and achieve good application results.
作者
许晓东
何丽丝
王德禹
XU Xiao-dong;HE Li-si;WANG De-yu(School of Naval Architecture,Ocean and Civil Engineering,Shanghai Jiaotong Unversity,Shanghai 200240,China)
出处
《舰船科学技术》
北大核心
2021年第5期92-96,共5页
Ship Science and Technology
基金
教育部、财政部重大科研项目资助项目(教技函[2013]35号)。