SE-Ⅱ东方炉运行主要问题原因分析与改进建议 被引量:1

Cause Analysis of Main Problems in Operation and Suggestions for Improvement about SE-ⅡOriental Furnace
下载PDF
导出
摘要 SE-Ⅱ东方炉首次商业运行一年来,气化炉及关联设备存在的主要问题也逐步暴露出来,作者通过对运行实际过程中发生问题的收集、分类总结并分析,提出行之有效的解决办法并予以实施。同时,也进一步梳理出了目前还存在但暂未解决的问题。并从实际出发对气化炉的下一步改进提出了建议,期望能对具有中国石化自有专利的煤气化技术获得更大范围的推广应用起到抛砖引玉的作用。 The main problems ofthe furnace and its associated equipmentwere exposed gradually since its first commercial operation for one year.Effective solutions of the problemswere put forward,by collecting,classifying,summarizing and analyzingthe problems in the actual operation.At the same time,the problems that still existed but had not been solved in advancewere also combed out.It was expected that the technology of Sinopec proprietary,which was about the coal gasified,can be widely applied.
作者 刘振宁 孙晓伟 李海根 LIU Zhen-ning;SUN Xiao-wei;LI Hai-gen(Chemical Branch of Zhong an United Chemical Co.,Ltd.,Anhui Huainan 232000,China)
出处 《广州化工》 CAS 2021年第11期101-104,共4页 GuangZhou Chemical Industry
关键词 东方炉 运行问题 原因分析 oriental furnace operational problems cause analysis
  • 相关文献

参考文献7

二级参考文献48

共引文献13

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部