摘要 脚手架是海洋工程建造施工过程中不可或缺的临时辅助设施。文章基于对深水半潜式生产平台下浮体整体布局特征研究及典型的建造工艺特点分析,并结合脚手架在类似工程施工中的实际应用,阐述了下浮体建造的脚手架施工方案的制定。同时分析了方案制定过程中的关键影响因素,为同类工程项目建造脚手架施工方案制定提供参考。 Scaffolding is an indispensable temporary auxiliary facility during the construction of offshore engineering.Based on the research on the overall layout characteristics of the hull of the deep-water semi-submersible production platform and the analysis of typical construction process characteristics,combined with the actual application of scaffolding in the construction of similar projects,the formulation of the scaffold construction plan for the construction of the hull is described.At the same time,it summarizes and analyzes the key influencing factors in the process of plan formulation,and provides reference for the formulation of scaffold construction plan for similar projects.
作者 余明淦 刘立范 姚大伟 王永召 张玮佳 YU Minggan;LIU Lifan;YAO Dawei;WANG Yongzhao;ZHANG Weijia
出处 《中国修船》 2021年第3期39-43,共5页 China Shiprepair
关键词 半潜式生产平台 下浮体建造 脚手架 semi-submersible production platform hull construction scaffolding
  • 相关文献

参考文献3

二级参考文献30

  • 1刘海霞.深海半潜式钻井平台的总布置[J].中国海洋平台,2007,22(3):7-11. 被引量:16
  • 2Chakrabarti S. Handbook of Offshore Engineering Ⅱ [M]. New York: Elsevier, 2005.
  • 3.CB-Z319-1982:运输船重量分类及重心计算-中华人民共和国国家标准-船舶标准(2008)网络版标准[S/CD].北京:中国标准出版社,2008.
  • 4Murray J J, Yang C K, Chen C Y, et al. Two dry tree semisubmersible designs for ultra deep water post-katrina Gulf of Mexico[ C]// ASME 27th International Conference on Offshore Mechanics and Arctic Engineering. Estoril: [ s. n. ], 2008.
  • 5Frank L. Dry or wet trees in deepwater developments from a riser system perspective[ C]//3rd International Deep-Ocean Technology Symposium. Beijing: [ s. n. ], 2009.
  • 6Cermelli C A, Roddier D G, Busso C C. A novel concept of minimal floating platform for marginal field development[ C]//14th Interna- tional Offshore and Polar Engineering Conference. Toulon: [s. n. ], 2004.
  • 7Murray J, Chen C Y, Yang C K. Mating analysis of the truss and hull sections on the truss semisubmersible in open water[ C]//Marine Operations Specialty Symposium(MOSS). Singapore: [ s. n. ], 2008.
  • 8Chert C Y, Ding Y, Mills T, et at. Improving the motions of a semi by the addition of heave plates[ C ]//ASME 27th Internationat Con- ferenee on Offshore Mechanics and Arctic Engineering. Estoril: [ s. n. ], 2008.
  • 9Steen A, TognareUi M, Xu L X, et al. Dry tree semisubmersible options for deepwater production[ C]//21 st International Conference on Offshore Mechanics and Arctic Engineering. Oslo: [s. n. ], 2002.
  • 10YANG C K, Murray J, Nab E, et al. An investigation of stability and workability of ESEMI under the pre-serviee condition in Gulf of Mexico[ C]//ASME 27th International Conference on Offshore Mechanics and Arctic Engineering. Estoril: [ s. n. ], 2008.

共引文献45

同被引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部