摘要
泵站改(扩)建工程中,土建及安装工程前期的基坑施工尤为关键,基坑施工的质量关系到泵站整体工程在后期投入使用的安全性,因此,在工程建设中需采取有效措施严格把控基坑工程施工的每个细节,以促进工程顺利开展。文章以西郭桥泵站改扩建工程为例,探讨在泵站基坑施工过程中的主要技术,以及保障工程质量的主要控制措施。
In reconstruction and expansion project of pump station,the foundation pit construction in the early stage of civil engineering and installation engineering is particularly critical.The quality of the foundation pit construction is related to the safety of the pump station in the later stage.Therefore,it is necessary to take effective measures to strictly control every detail of the foundation pit construction to promote the smooth development of the project.This article takes the reconstruction and expansion project of Xiguo Bridge Pump Station as an example to discuss the main technologies in the construction of the pump station foundation pit and the main control measures to ensure the quality of the project.
作者
朱岳庚
史俊政
相志庆
顾黄飞
ZHU Yuegeng;SHI Junzheng;XIANG Zhiqing;GU Huangfei(Hongli Engineering Supervision Co.Ltd.,Wuxi 214000,China)
出处
《河南水利与南水北调》
2021年第2期45-46,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
泵站改(扩)建工程
西郭桥
基坑施工技术
pumping station reconstruction and expansion project
Xiguo Bridge
foundation pit construction technology