要顺利实施代建制水利工程项目,关键是不断提高代建制单位的项目管理水平。项目后评价是目前提高项目管理水平、实现持续优化的有效方法,但在实践中仍存在一些不足。约束理论(TOC)的应用是一种可以用来开发各种管理技术的方法,通过分析TOC在不断改进项目管理中存在的不足,介绍TOC的优点,重构了代建制单位项目管理的持续优化路径。该路径能有效提高代建制单位的管理效率和市场竞争力。
The key to implementation of water conservancy project with agent-construction system smoothly is to constantly improve the project management level of the construction units.Project post evaluation is an effective method to improve project management level and achieve continuous optimization,but there are still some shortcomings in practice.The application of the theory of constraints(TOC)is a method that can be used to develop various management techniques.By analyzing the shortcomings of TOC in improving project management,the advantages of TOC are introduced.The continuous optimization path of project management of agent construction unit is reconstructed.This path can effectively improve the management efficiency and market competitiveness of agent construction system units.
作者
朱双萍
ZHU Shuangping(Administration of Water Affairs of Xifeng of Guizhou,Xifeng 551100,China)
出处
《河南水利与南水北调》
2021年第2期66-68,共3页
Henan Water Resources & South-to-North Water Diversion